2011 Futuresoft Placement Papet - IIDelhi/NCR

  • CategoryIT
  • Sub CategoryPlacement Papers
  • LocationDelhi/NCR
  • CompanyFutureSoft
  • Posted date on our Website16 April 2011

User Ratings

0
Here are the details of 2011 Futuresoft Placement Papet - II job in FutureSoft. This job or placement paper has been sourced from either company website or newspaper or other media and from students who appeared for this job. User is requested to verify the data before applying for the job.

2011 Futuresoft Placement Papet - II with Answers and Solutions:-

1. Output of following C code

void main()
{
int i=4,j=5;
printf("%f",i/j);
}

(a) 0
(b) 0.8
(c) 1
(d) None of these

Ans-> (d)


2. In which of the following postfix notations there is no confusion between unary and binary minus.


(a) a*b--
(b) a--bc

3. Output of folowing C code

void main()
{
int i=0,j=0;
int arr[4][4] = {1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16};
clrscr();
for (i=2;i>=0;i--)
for(j=2;j>=0;j--)
printf("%d ", *(*(arr+j)+i));
getch();
}

(a)11 10 9 7 6 5 3 2 1
(b)11 7 3 10 6 2 9 5 1
(c)........
(d) None of these

Ans-> (b)

4.  If there is 4 jobs(j1,j2,j3,j4) and there deadlines (2,4,2,4).Which of the following scheduling is not possible.

(a)j1 j3 j2 j4
(b)j1 j2 j4 j3
(c)j1 j3 j4 j2
(d)j3 j1 j2 j4

5. 4 process allocated 8000 bytes of memory according to best fit as follows:-

p1 - 2000
p2 - 2000
p3 - 2500
p4 - 1500

p1 and p4 is released. If a process p with 1000 bytes enter where will it be paced
(a)After p1
(b)After p3
(c)Cannot be placed
(d).......

Ans->(b)

6. Heap with 10 bytes is present. Then which of the following series is possible 4 options of a series of malloc and free funtions.Don't remember the choices but easy to get the answer.

7. All combinational circuits can be implemented by
(a)Only NOR
(b)Only NAND
(c)Only XOR
(d)None of these

Ans-> (d)

8. void main()
{ int a=10,b=11;
printf("%d",a+++b);
printf("%d",a+++b);
}

(a.) 22,23
(b.) 23,24
(c.) 21,22
(d.) none

Ans->(c)


9. Some palindrome question.the

Ans : wer was (c)

10. Capacity of line...

Ans : was 900

11.Number of null pointers in any binary tree = n+1

12. print (Head(T))
Traverse(left(T))
print (Head(T))
Traverse(right(T)) -

Ans : : none of the above

13. Boolean expn Evalvate

14. Common subexpn : -

Ans : : a + e

15. LRU : 1, 2, 3.

8. Tr. Delay - 10000 bits

Ans : . 10.01

16. Grammar of Number of shift / reduce operator :

Ans : . 4

17
. CPU scheduling 9,8 ?

18.  S --> AB|AS

A --> a|aA
B --> b

19. What is the grammer accepted by the above?

Ans : . aa*b

20. allocation

Ans :
: (ii) only

21.
cobegin
begin x = y; x= x+1; y= x
begin x =y; z= z+1; y= z
coend

Ans :
. Number of values possi = 2

22. 2 bits flip / 2 bits exchange

Ans : : the word with one '1'

23. How many address lines are needed to address a 64Kb segment with each register storing upto 512 bytes.

Ans : . 14 address lines

23.In a computer system the ROM :

(a) contains boot software
(b) is permanent
(c) Both of the above
(d) None of the above

Ans : . (c)

24. Find the output for the following C program

int array[4][4] = {1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16};
for (i=2;i<0;i--)
for (j=2;j<=0;j--)
printf("%d", arr[i][j]);

25. Find the output for the following C program
#include
void main()
{int i,x,sum=0;
int arr[6]=[1,2,3,4,5,6]
for (i=0;i<4;i++)
sum+ = func(arr[i]);
printf("%d", sum);
}
func(int x)
{ int val,x;
val = 2;
return(x+ val++);
}

26. Given a string STOCK and a stack of size 4.

Which of the following strings cannot be generated using this stack.
(a) TSOCK
(b) TOSKC
(c) STOCK
(d) TKOSC
(e) None of these

27. What range of integral values can be stored using 32 bits?

About FutureSoft :-

FutureSoft is a software consulting and technology services company specializing in industry-specific solutions, strategic outsourcing and integration services. Clients gain competitive advantage by leveraging our product development, delivery capabilities to achieve their product milestones with world-class quality and reduced costs.

FutureSoft was established in 1988. It is a dependable partner for more than 100 satisfied clients that include diverse range of Fortune and SME companies. FutureSoft development center is assessed at Level 4 in SEI CMMI®, and is also ISO 9001:2008 certified.

Working at FutureSoft - Why should i join FutureSoft?:-

Working at FutureSoft is an enjoyable experience by providing a right balance between work and fun. Informal dress and vibrant weekends mix with a sense of teamwork inculcated from the very beginning.

FutureSoft strive to provide an environment that is stimulating with high levels of motivation, empowerment and recognition, removing obstacles that hinder creativity. In this energized atmosphere we share successes while setting new standards of excellence.
 

Contact Details:

Address of FutureSoft:-

FutureSoft India Pvt. Ltd.

253, Okhla Industrial Estate, Phase III
New Delhi - 110020 India
Voice : +91-11-4222 8888
Fax :    +91-11-4161 2344

(Disclaimer : This Job or placement paper has been sourced from various sources like print media, Job consultants, past candidates, our users and/ or Company website. The posted date above means the date on which the Job was posted on our site and not on the company site. Users are advised to check with the company for latest requirements before applying for the job. Our website will not be responsible for any loss to the company or the candidate. We have no relation with the company and are not responsible for the validity of this Job. We donot charge the company or candidate or any student anything. If the respective company has any issue with the data provided or they want this particular job or placement paper to be removed they can write into us at infinitecourses@gmail.com)

Comments / Reviews / Queries On

Click to See more Comments